About Informetric

Large Pharmaceutical Company Runs Lean With Informetric OEE Reports

Project Requirements:

  • Generate a high-level report that summarizes data of downtime events, equipment performance, and product output
  • Show a comparison identifying the amount of sellable product produced to the amount of sellable product that could have been produced in an optimal setting
  • Determine typical operator response time per batch, over a specified duration of time
  • Identify downtime between batches

Solution:

  • Informetric Systems InfoBatch

Results:

  • Customer was able to provide management with an on-demand report that provided a detailed overview for each cycle and phase
  • Batch product rates are calculated and compared to the ideal product rate
  • Operator response times are identified, providing the opportunity to address potential bottlenecks
  • Downtime calculations were automated, reducing customer time and effort spend on manual analysis